Skip to content

Update sbt to 1.11.2 #628

Update sbt to 1.11.2

Update sbt to 1.11.2 #628

Triggered via pull request June 10, 2025 03:47
Status Failure
Total duration 48s
Artifacts

ci.yml

on: pull_request
Matrix: mimaReport
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

34 errors
test (8, 2.13.11)
Process completed with exit code 127.
checks
Process completed with exit code 127.
test (11, 2.12.18)
Process completed with exit code 127.
mimaReport (17, 2.11.12)
Process completed with exit code 127.
mimaReport (8, 2.12.18)
The strategy configuration was canceled because "mimaReport._17_2_11_12" failed
test (8, 2.12.18)
Process completed with exit code 127.
test (8, 2.12.18)
The strategy configuration was canceled because "test._8_2_13_11" failed
mimaReport (17, 2.13.11)
Process completed with exit code 127.
test (11, 2.11.12)
Process completed with exit code 127.
test (11, 2.11.12)
The strategy configuration was canceled because "test._8_2_13_11" failed
mimaReport (11, 2.13.11)
Process completed with exit code 127.
mimaReport (11, 2.13.11)
The strategy configuration was canceled because "mimaReport._17_2_11_12" failed
mimaReport (8, 2.13.11)
Process completed with exit code 127.
mimaReport (8, 2.13.11)
The strategy configuration was canceled because "mimaReport._17_2_11_12" failed
mimaReport (8, 2.11.12)
Process completed with exit code 127.
mimaReport (8, 2.11.12)
The strategy configuration was canceled because "mimaReport._17_2_11_12" failed
mimaReport (11, 2.11.12)
Process completed with exit code 127.
mimaReport (11, 2.11.12)
The strategy configuration was canceled because "mimaReport._17_2_11_12" failed
test (17, 2.13.11)
The operation was canceled.
test (17, 2.13.11)
The strategy configuration was canceled because "test._8_2_13_11" failed
test (11, 2.13.11)
Process completed with exit code 127.
test (11, 2.13.11)
The strategy configuration was canceled because "test._8_2_13_11" failed
test (17, 2.11.12)
The operation was canceled.
test (17, 2.11.12)
The strategy configuration was canceled because "test._8_2_13_11" failed
test (17, 2.12.18)
Process completed with exit code 127.
test (17, 2.12.18)
The strategy configuration was canceled because "test._8_2_13_11" failed
test (8, 2.11.12)
The operation was canceled.
test (8, 2.11.12)
The strategy configuration was canceled because "test._8_2_13_11" failed
mimaReport (11, 2.12.18)
The operation was canceled.
mimaReport (11, 2.12.18)
The strategy configuration was canceled because "mimaReport._17_2_11_12" failed
mimaReport (17, 2.12.18)
The operation was canceled.
mimaReport (17, 2.12.18)
The strategy configuration was canceled because "mimaReport._17_2_11_12" failed
test-coverage
Process completed with exit code 127.
microsite
Process completed with exit code 1.