chore: replace once_lock with standard library #1238
sqlx-cli.yml
on: pull_request
Check
26s
Functional Test (MySQL)
33s
Functional Test (PostgreSQL)
28s
Functional Test (SQLite)
20s
Matrix: Build
Matrix: Integration Test
Annotations
16 errors
Integration Test (ubuntu-latest)
Process completed with exit code 101.
|
Build (ubuntu-latest)
Process completed with exit code 101.
|
Functional Test (SQLite)
Process completed with exit code 101.
|
Integration Test (macOS-13)
The operation was canceled.
|
Integration Test (macOS-13)
The strategy configuration was canceled because "integration-test.ubuntu-latest" failed
|
Build (macOS-13)
The operation was canceled.
|
Build (macOS-13)
The strategy configuration was canceled because "build.ubuntu-latest" failed
|
Integration Test (macOS-latest)
The operation was canceled.
|
Integration Test (macOS-latest)
The strategy configuration was canceled because "integration-test.ubuntu-latest" failed
|
Build (macOS-latest)
The operation was canceled.
|
Build (macOS-latest)
The strategy configuration was canceled because "build.ubuntu-latest" failed
|
Build (windows-latest)
The operation was canceled.
|
Build (windows-latest)
The strategy configuration was canceled because "build.ubuntu-latest" failed
|
Check
Process completed with exit code 101.
|
Functional Test (PostgreSQL)
Process completed with exit code 101.
|
Functional Test (MySQL)
Process completed with exit code 101.
|