Skip to content

chore: 🐝 Update SDK - Generate 0.37.2 #714

chore: 🐝 Update SDK - Generate 0.37.2

chore: 🐝 Update SDK - Generate 0.37.2 #714

Triggered via pull request June 24, 2025 15:44
Status Cancelled
Total duration 5m 29s
Artifacts

ci.yaml

on: pull_request
Matrix: test_contract
Matrix: test_integration
Matrix: test_unit
Fit to window
Zoom out
Zoom in

Annotations

14 errors
test_contract (3.10)
Process completed with exit code 2.
test_contract (3.12)
The operation was canceled.
test_contract (3.12)
The strategy configuration was canceled because "test_contract._3_10" failed
test_contract (3.9)
The operation was canceled.
test_contract (3.9)
The strategy configuration was canceled because "test_contract._3_10" failed
test_integration (3.9)
The operation was canceled.
test_integration (3.9)
Canceling since a higher priority waiting request for CI-refs/pull/278/merge exists
test_integration (3.11)
The operation was canceled.
test_integration (3.11)
Canceling since a higher priority waiting request for CI-refs/pull/278/merge exists
test_integration (3.12)
The operation was canceled.
test_integration (3.12)
Canceling since a higher priority waiting request for CI-refs/pull/278/merge exists
test_integration (3.10)
The operation was canceled.
test_integration (3.10)
Canceling since a higher priority waiting request for CI-refs/pull/278/merge exists
CI
Canceling since a higher priority waiting request for CI-refs/pull/278/merge exists