Skip to content

HBT Bulk Connection to Substrate Layout #609

@Ikram-rs22

Description

@Ikram-rs22

Hi,
In QUCS-S, we see the HBT has 4 terminals - base, emitter, collector. In the layout rules, the bulk tie is shown as the outer ring of the HBT.
I saw in another issue, the Pcell of the hbt is already bulk tied to the ground upon placing the cell in the layout window. So my question is, do I need to manually connect the HBT to the substrate or is it by default connected? I saw ptap cells have been used for this purpose in different designs. However, what I did was to place contact on the bulk ring and drew metal 1 to ground pads.

Image

Also in the layout rules - it is shown that contacts are drawn outside of the TRANS layer.

Image

Thank you,
Ikram

Metadata

Metadata

Assignees

No one assigned

    Labels

    questionFurther information is requested

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions